Now showing items 1-5 of 5
Description: | Faculty of Engineering. Cochin University of Science and Technology |
URI: | http://dyuthi.cusat.ac.in/purl/2358 |
Files | Size |
---|---|
Dyuthi-T0630.pdf | (3.053Mb) |
Abstract: | Chapter 1 presents a brief note on the state at which the construction industry stands at present, bringing into focus the significance of the critical study. Relevance of the study, area of investigation and objectives of the study are outlined in this chapter. The 2nd chapter presents a review of the literature on the relevant areas. In the third chapter an analysis on time and cost overrun in construction highlighting the major factors responsible for it has been done. A couple of case studies to estimate loss to the nation on account of delay in construction have been presented in the chapter. The need for an appropriate estimate and a competent contractor has been emphasised for improving effectiveness in the project implementation. Certain useful equations and thoughts have been formulated on this area in this chapter that can be followed in State PWD and other Govt. organisations. Case studies on project implementation of major projects undertaken by Government sponsored/supported organizations in Kerala have been dealt with in Chapter 4. A detailed description of the project of Kerala Legislature Complex with a critical analysis has been given in this chapter. A detailed account of the investigations carried out on the construction of International Stadium, a sports project of Greater Cochin Development Authority is included here. The project details of Cochin International Airport at Nedumbassery, its promoters and contractors are also discussed in Chapter 4. Various aspects of implementation which led the above projects successful have been discussed in chapter 5. The data collected were analysed through discussion and perceptions to arrive at certain conclusions. The emergence of front-loaded contract and its impact on economics of the project execution are dealt with in this chapter. Analysis of delays in respect of the various project narrated in chapter 3 has been done here. The root causes of the project time and overrun and its remedial measures are also enlisted in this chapter. Study of cost and time overrun of any construction project IS a part of construction management. Under the present environment of heavy investment on construction activities in India, the consequences of mismanagement many a time lead to excessive expenditure which are not be avoidable. Cost consciousness, therefore has to be keener than ever before. Optimization in investment can be achieved by improved dynamism in construction management. The successful completion of coristruction projects within the specified programme, optimizing three major attributes of the process - quality, schedule and costs - has become the most valuable and challenging task for the engineer - managers to perform. So, the various aspects of construction management such as cost control, schedule control, quality assurance, management techniques etc. have also been discussed in this fifth chapter. Chapter 6 summarises the conclusions drawn from the above criticalr1 of rhajor construction projects in Kerala. |
Description: | School of Engineering,Cochin University of Science and Technology |
URI: | http://dyuthi.cusat.ac.in/purl/3255 |
Files | Size |
---|---|
Dyuthi-T1229.pdf | (9.291Mb) |
Abstract: | With the advent of urbanisation and consequent search for more and more habitable land, it was imperative that the large tracts of marine clays, considered inhabitable earlier, had to be reclaimed and developed. These marine clays, wellknown for its high compressibility and poor shear strength, posed numerous problems to the builders and Cochin was no exception. It is only less than a decade since active research work was initiated on marine clays in general and Cochin marine clays in particular. Eventhough some systematic studies are available on compressibility characteristics, attempts to study the shear strength aspects and development of techniques to improve it have been very limited. This work is an investigation on the consolidation and shear strength characteristics of Cochin marine clays including methods to improve the same |
Description: | School of Engineering Cochin University of Science and Technology |
URI: | http://dyuthi.cusat.ac.in/purl/3452 |
Files | Size |
---|---|
Dyuthi-T1420.pdf | (7.156Mb) |
Abstract: | There are numerous parameters affecting the compressibility characteristics of soft clays. A few of them such as load increment ratio, type of drainage and thickness of sample were taken up for detailed investigation. However, the main thrust in the present investigations was to develop an insight into the benefits of preloading technique, envolve procedures and establish design charts for preparation of a precompression programme which will substantially reduce the consolidation settlements of the extremely soft deposits of Cochin marine clays. |
Description: | School of Engineering, Cochin University of Science & Technology |
URI: | http://dyuthi.cusat.ac.in/purl/3725 |
Files | Size |
---|---|
Dyuthi-T1699.pdf | (265.2Mb) |
Abstract: | Soil moisture plays a cardinal role in sustaining eclological balance and agricultural development – virtually the very existence of life on earth. Because of the growing shortage of water resources, we have to use the available water most efficiently by proper management. Better utilization of rainfall or irrigation management depends largely on the water retention characteristics of the soil.Soil water retention is essential to life and it provides an ongoing supply of water to plants between periods of irrigation so as to allow their continued growth and survival.It is essential to maintain readily available water in the soil if crops are to sustain satisfactory growth. The plant growth may be retarded if the soil moisture is either deficient or excessive. The optimum moisture content is that moisture which leads to optimum growth of plant. When watering is done, the amount of water supplied should be such that the water content is equal to the field capacity that is the water remained in the saturated soil after gravitational drainage. Water will gradually be utilized consumptively by plants after the water application, and the soil moisture will start falling. When the water content in the soil reaches the value known as permanent wilting point (when the plant starts wilting) fresh dose of irrigation may be done so that water content is again raised to the field capacity of soil.Soil differ themselves in some or all the properties depending on the difference in the geotechnical and environmental factors. Soils serve as a reservoir of the nutrients and water required for crops.Study of soil and its water holding capacity is essential for the efficient utilization of irrigation water. Hence the identification of the geotechnical parameters which influence the water retention capacity, chemical properties which influence the nutrients and the method to improve these properties have vital importance in irrigation / agricultural engineering. An attempt in this direction has been made in this study by conducting the required tests on different types of soil samples collected from various locations in Trivandrum district Kerala, with and without admixtures like coir pith, coir pith compost and vermi compost. Evaluation of the results are presented and a design procedure has been proposed for a better irrigation scheduling and management. |
Description: | Division of Civil Engineering, Cochin University of Science and Technology |
URI: | http://dyuthi.cusat.ac.in/purl/2361 |
Files | Size |
---|---|
Dyuthi-T0633.pdf | (5.314Mb) |
Now showing items 1-5 of 5
Dyuthi Digital Repository Copyright © 2007-2011 Cochin University of Science and Technology. Items in Dyuthi are protected by copyright, with all rights reserved, unless otherwise indicated.