DSpace About DSpace Software
 

Dyuthi @ CUSAT >
Ph.D THESES >
Faculty of Social Sciences >

Please use this identifier to cite or link to this item: http://purl.org/purl/3423

Title: Time and cost overruns of industrial projects in kerala
Authors: Suresh, V N
Dr.Wilson, P R
Keywords: Industrial projects
Time overrun
Cost estimate
Project
Issue Date: Jun-2000
Publisher: Cochin University of Science And Technology
Abstract: Poor project planning, implementation and control and the subsequent cost and time overruns are ubiquitous features that have been posing serious concern at all levels - state, national and international. It results in wastage of the nation's scarce resources and retards the socio-economic progress. Although several studies peripheral on project overruns have been made at the national level, no serious attempt has been made at the state level to identify the magnitude of overruns, their causes and impacts on industrial projects. The present study "Time and Cost Overruns of Industrial Projects in Kerala" is an earnest attempt to probe in depth the time and cost overruns and their impact on industrial projects. The study places emphasise on the identification of the real reasons behind the cost and time overruns. It also covers the present project management practices of industrial projects in Kerala.
Description: School of management studies, Cochin University of Science And Technology
URI: http://dyuthi.cusat.ac.in/purl/3423
Appears in Collections:Faculty of Social Sciences

Files in This Item:

File Description SizeFormat
Dyuthi-T1394.pdfpdf2.61 MBAdobe PDFView/Open
View Statistics

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

 

Valid XHTML 1.0! DSpace Software Copyright © 2002-2010  Duraspace - Feedback